Powered By Blogger

dimanche 28 août 2011

HOW TO INSTALL A PREHUNG DOOR

Hanging a door these days is easier than its ever been. In the days before prehung doors, it took more tools besides knowledge to hang a door than it does now.

Imagine getting a door slab, an unassembled door jamb, hinges also doorway hardware and having to do all the mortising, drilling, rabbeting on site.

No longer bring off we need an array of tools such as a drill, a mortising jig being hinges, strikes, and shaft plate. No jig seeing drilling the backset through the doorknob and bolt.

pronto all you need is a hammer further hard trim nails or a finish spike gun and some shims.

its first thing you need to do is check the opening you'll be hanging the door prestige for the correct size. It should be 2" souped up than its door size. Even though it's a bumpy opening it should be reasonably plumb and square.

If the opening was framed by someone else, you may long to break out your level and framing square and check this further. Drywallers sometimes admit the rough opening was mean as them and will let the drywall run into the opening. If this is its case use a drywall truism or sawzall to cut it behind.

Once all the vitals have been checked your ready to hang a door. Prehung doors come fabricated the couple distant ways. They can be bought with prone already mitered and nailed on to one side and without unbroken. If there is no trim installed, we like to put it on before I put the door in the rudiment. The trim is installed on the hinge side.

most doors give impulse into a room and against a wall. When putting the door into the opening, try to moor the door in the center of the opening. The door jamb should be able to move to the left also right in the opening. The gap between the door besides jamb on the hinge side is usually about an 1/8" of an inch. This dictates its gap or space we should have all around its door. Move the door jamb to the left or right until you have that akin space during the top. You then nail the trim on the top gander side again the bottom hinge side. then nail the demand side on the top making sure you still have an equal elbow-room. Nail off its rest of the hinge side curtain 3 or 4 more nails. The 2 nails already in the top are all I much put in. Now nail the rest of the strike feature starting at the top and working your way down, progressing the same space as the top and hinge side.

Once the door is nailed into the opening on the inside, it's clock to shim the door jamb. First, pull the door closed to make sure it hits the door stop evenly on the strike plane. If it is hitting only at the top pull the hinge side toward we till it hits even. If it hits only at the bottom, push the hinge aspect jamb away from you till it hits evenly.

Once you get the jamb calm put shims between the jamb and stud opening, being careful not to bow the jamb into the initiation. If need be use a open edge to alimony absolute straight. I put shims behind every hinge and the enjoin and also at the top and bottom of its strike side. we nail these shims in ditch two nails, one on each side of the stop.

The below step is to apply the door casing to the outside of the door. Once this is done, your ready owing to the door hardware. If everything went right, the bolt should engage its strike plate and the door should tailor-made snuggly against the stops.

(c) 2005 Mike Merisko sawkerfs.comOriginal Source:
BEST DESIGN

Aucun commentaire:

Enregistrer un commentaire